Boat Building Gallery: Bayliss Boatworks

Bayliss Boatworks' 84' Orion is currently in the shed. This project started in April 2011, and we have pictures captured from the very beginning. View the highlights, like hull flips and engine and cabin installations, from this starting hull jig to present.
Cabin Jig
Planking the Bottom
Bottom Planked
Bottom and Sides Planked, Sides with 2nd Layer
Sides Planked with 3rd Layer
Third layer planked. The final plank is the whiskey plank! The crew takes a shot.
Hull Glassed
Preparing to Flip the Hull
Flipping the Hull
Hull flipped
Back in the Shop After Removal of Hull Jig
Main Bulkhead Installation
Cockpit Lazarette Area Strut Pad Build-out
Hull Glassing the Mid-section
Aft Engine Bulkhead Installed
Engine Air Vent Cut Out
Cabin and Bridge Assembly, and Engine Air Vent
Hull 16 Outside
Hull 16 Outside
Salon Deck Construction
Galley Deck Construction (Aluminum Framework in Place)
View from Bowstem Aft / Forward Sole Installation
Glassing the Flybridge Walls
Forward Master Stateroom Bulkhead
All 84’
Bowdeck Carlin Installation
Generator Installation
Engine Installation
Engine Installation
Engines Installed
Salon Deck Installation
Galley Deck Installation
Full View of All 84’
Outside for Cabin Installation
Cabin Installation
Cabin Installation
Cabin Installation
Cabin Installed
Hull 16 Outside
Patterns for the Salon Windows
The Flybridge
A View Inside the Shop
Starting the Flybridge Cabinet Build-out
Cockpit Construction
Flybridge Cabinetry Construction
Looking Aft from the Cockpit Forward in the Salon
Glassing the Bow Deck
Bow Deck Glassed
Salon Windows Cut
The Bow